Power Generation Plant
Power Generation Plant
Erection of an 8,500-ton steel structure assembled with gantry cranes and 7,500 sqm of roof cladding, 18,000 sqm of wall cladding with polyurethane panels. Installation of special flashing pieces and gutters.
Erection of an 8,500-ton steel structure assembled with gantry cranes and 7,500 sqm of roof cladding, 18,000 sqm of wall cladding with polyurethane panels. Installation of special flashing pieces and gutters.