Karamolegkos
- Koropi
- 2021
- completed project
EMPLOYER: TUBANIARIS METALLIC MANUFACTURERS
Installation of a metal frame of approximately 100,000kg, covering with 80mm polyurethane panels and side covering with 80mm polyurethane panels.
EMPLOYER: TUBANIARIS METALLIC MANUFACTURERS
Installation of a metal frame of approximately 100,000kg, covering with 80mm polyurethane panels and side covering with 80mm polyurethane panels.