EMPLOYER: TOUBANIARIS METAL CONSTRUCTIONS
Installation of a 370,000kg metal frame of three batteries and installation of 3,000m of Symdeck sheet metal.
Assembling a three-story 270-ton metal frame. Installation of composite floor sheeting (Symdeck) 3,400m2