Power production plant
- Iraq
- 2018
- completed project
Construction of metal frame mounting with cranes 8.500t, overlay 7.500 m2 and sidewall cover 18.000 m2 with polyurethane panel. Installation of special cuts and gutters.
Construction of metal frame mounting with cranes 8.500t, overlay 7.500 m2 and sidewall cover 18.000 m2 with polyurethane panel. Installation of special cuts and gutters.